Sửa chữa bề mặt mối nối ngang của tuabin hơi nước
After high-temperature and high-pressure operation of the steam turbine, part of the stress is released, resulting in cylinder deformation, excessive gap at the cylinder horizontal joint face, poor sealing, and also bringing uncertainties to steam seal adjustment during maintenance.

Through years of experience, our company has a team of highly skilled on-site service personnel who can perform grinding after repair welding on the horizontal joint face, achieving the standard where the gap at the cylinder horizontal joint face is less than 0.07 mm (no-go) and less than 0.03 mm (no-pass) without tightening the bolts.
Construction Features
The cold welding process is adopted. No preheating is required before welding. The cylinder horizontal joint face is welded in strips or fully welded, without causing significant stress or deformation to the cylinder.
Each weld pass is stopped after welding a single length of 200 mm to 300 mm to control thermal deformation.
After welding, the rough grinding process is performed using our company’s self-developed magnetic milling and grinding machine, which can quickly complete the rough machining process and save valuable maintenance time.
The finish grinding process is performed by manual grinding, which can well compensate for the deformation of the upper cylinder.
Partial Performance of Steam Turbine Horizontal Joint Face Repair
| Tên khách hàng | Product Name | Thông tin về đơn vị |
| Jingneng Qinhuangdao Thermal Power Co., Ltd. | Cylinder Surface Repair | 350 MW |
| CHN Energy Shenwan Ma’anshan Power Generation Co., Ltd. | Low Pressure Cylinder Horizontal Joint Face Deformation On-Site Repair and Treatment | 330 MW |
| Jilin Electric Power Co., Ltd. Changchun Thermal Power Branch | Unit 2 Steam Turbine Cylinder Grinding Construction Project | 350 MW |
| Huadian Xinjiang Yili Coal Power Co., Ltd. | #2 Steam Turbine Low Pressure Cylinder Joint Surface Treatment | 300 MW |
| China Resources Power (Tangshan Caofeidian) Co., Ltd. | High and Intermediate Pressure Outer Cylinder Horizontal Joint Face Gap Treatment | 1.000 MW |
| Jinkong Power Tonghua Shanxi Power Generation Co., Ltd. | Low Pressure Inner Cylinder Deformation Repair | 660 MW |
| Datang Pucheng No. 2 Power Generation Co., Ltd. | Unit 6 Low Pressure Cylinder Gland Seal Horizontal Joint Face Repair | 660 MW |
| Shaanxi Nonferrous Metals Yulin New Materials Group Co., Ltd. | Unit 3 High, Intermediate and Low Pressure Cylinder Cylinder Surface Repair Welding and Grinding Project | 330 MW |
| Shaanxi Meixin Jinyang Power Generation Co., Ltd. | High Pressure Inner Cylinder Grinding | 350 MW |
| Inner Mongolia Daihai Power Generation Co., Ltd. | High and Intermediate Pressure Outer Cylinder Cylinder Surface Repair, High and Intermediate Pressure Inner Cylinder Cylinder Surface Repair and Boring | 600 MW |
| Tianjin Guohua Panshan Power Generation Co., Ltd. | Unit 1 Steam Turbine Body High and Intermediate Pressure Cylinder Joint Surface Gap Repair | 500MW |
| Hebei Hengfeng Power Generation Co., Ltd. | High and Intermediate Pressure Outer Cylinder Joint Surface Repair Welding and Grinding | 330 MW |
| Henan China Resources Power Shouyangshan Co., Ltd. | High and Intermediate Pressure Cylinder Horizontal Joint Face Nut Contact Surface Repair and Grinding | 600 MW |
Chúng tôi rất coi trọng ý kiến phản hồi và thắc mắc của quý khách. Nếu quý khách có bất kỳ câu hỏi nào về sản phẩm hoặc dịch vụ của chúng tôi, vui lòng điền vào biểu mẫu dưới đây và chúng tôi sẽ liên hệ lại với quý khách trong thời gian sớm nhất.
Liên hệ với chúng tôi
Số 157, đường Shenhe, Khu Phát triển Kinh tế và Công nghệ, thành phố Qinhuangdao, tỉnh Hà Bắc, Trung Quốc
Bản quyền © 2026 Công ty TNHH Công nghệ Điện Qinhuangdao Hua Yu Tong - Mọi quyền được bảo lưu.