Dalubhasa sa pananaliksik at pagpapaunlad at paggawa ng teknolohiya sa pagsi-selyo ng umiikot na kagamitan at mga kasangkapan sa pagpapanatili ng kagamitan sa pagbuo ng kuryente

Mga Serbisyong Inhinyeriya

Paglalaan ng Pinagsamang Harap ng Steam Turbine na Patayo

Paglalarawan ng Produkto

After high-temperature and high-pressure operation of the steam turbine, part of the stress is released, resulting in cylinder deformation, excessive gap at the cylinder horizontal joint face, poor sealing, and also bringing uncertainties to steam seal adjustment during maintenance.

Through years of experience, our company has a team of highly skilled on-site service personnel who can perform grinding after repair welding on the horizontal joint face, achieving the standard where the gap at the cylinder horizontal joint face is less than 0.07 mm (no-go) and less than 0.03 mm (no-pass) without tightening the bolts.

Construction Features

The cold welding process is adopted. No preheating is required before welding. The cylinder horizontal joint face is welded in strips or fully welded, without causing significant stress or deformation to the cylinder.

Each weld pass is stopped after welding a single length of 200 mm to 300 mm to control thermal deformation.

After welding, the rough grinding process is performed using our company’s self-developed magnetic milling and grinding machine, which can quickly complete the rough machining process and save valuable maintenance time.

The finish grinding process is performed by manual grinding, which can well compensate for the deformation of the upper cylinder.

Partial Performance of Steam Turbine Horizontal Joint Face Repair

Pangalan ng Kustomer Product Name Impormasyon ng Yunit
Jingneng Qinhuangdao Thermal Power Co., Ltd. Cylinder Surface Repair 350 megawatts
CHN Energy Shenwan Ma’anshan Power Generation Co., Ltd. Low Pressure Cylinder Horizontal Joint Face Deformation On-Site Repair and Treatment 330 megawatts
Jilin Electric Power Co., Ltd. Changchun Thermal Power Branch Unit 2 Steam Turbine Cylinder Grinding Construction Project 350 megawatts
Huadian Xinjiang Yili Coal Power Co., Ltd. #2 Steam Turbine Low Pressure Cylinder Joint Surface Treatment 300MW
China Resources Power (Tangshan Caofeidian) Co., Ltd. High and Intermediate Pressure Outer Cylinder Horizontal Joint Face Gap Treatment Isang libong megawatts
Jinkong Power Tonghua Shanxi Power Generation Co., Ltd. Low Pressure Inner Cylinder Deformation Repair Anim na raang animnapu't sampung megawatts
Datang Pucheng No. 2 Power Generation Co., Ltd. Unit 6 Low Pressure Cylinder Gland Seal Horizontal Joint Face Repair Anim na raang animnapu't sampung megawatts
Shaanxi Nonferrous Metals Yulin New Materials Group Co., Ltd. Unit 3 High, Intermediate and Low Pressure Cylinder Cylinder Surface Repair Welding and Grinding Project 330 megawatts
Shaanxi Meixin Jinyang Power Generation Co., Ltd. High Pressure Inner Cylinder Grinding 350 megawatts
Inner Mongolia Daihai Power Generation Co., Ltd. High and Intermediate Pressure Outer Cylinder Cylinder Surface Repair, High and Intermediate Pressure Inner Cylinder Cylinder Surface Repair and Boring Anim na raang megawatts
Tianjin Guohua Panshan Power Generation Co., Ltd. Unit 1 Steam Turbine Body High and Intermediate Pressure Cylinder Joint Surface Gap Repair 500MW
Hebei Hengfeng Power Generation Co., Ltd. High and Intermediate Pressure Outer Cylinder Joint Surface Repair Welding and Grinding 330 megawatts
Henan China Resources Power Shouyangshan Co., Ltd. High and Intermediate Pressure Cylinder Horizontal Joint Face Nut Contact Surface Repair and Grinding Anim na raang megawatts

 

Pagtatanong

Lubos naming pinahahalagahan ang iyong mga puna at katanungan. Kung mayroon kang anumang katanungan tungkol sa aming mga produkto o serbisyo, mangyaring punan ang form sa ibaba at makikipag-ugnayan kami sa iyo sa lalong madaling panahon.


    Copyright © 2026 Qinhuangdao Hua Yu Tong Electric Tech Co., Ltd. - Lahat ng karapatan ay nakalaan.

    Kumuha ng Libreng Kotsasyon